This clinic was constructed in a new strip mall on the second level. There were numerous operatories, private bathroom, reception and other areas. Being on the second level all piping was done from the area below which required extensive concrete core drilling and fire stopping. The area was constructed on temporary power and heat as the base building services had not been completed. Approximate construction time was eight weeks.